We are headed back down to S-Town this weekend and depending on where things are, weather, etc. we will hopefully chip in and stack some more blocks on the main level. All of the Nudura has been delivered and is ready to roll. Getting the first level situated is the most challenging part, after that it should go fairly quickly up to the roof line.

This past week we have been competing with weather - bad (rain) and good (hay) so there wasn’t a lot of activity, but the boys at Citywide were very gracious and helped us out with a great deal of scrap for fill in under the garage and the master bedroom.

With any luck we’ll have some additional intel on the roof soon.